Time Spent on Engineering & Technology Activities Mega Study
Contents
Time Spent on Engineering & Technology Activities
Time Spent on Engineering & Technology Activities

Related

A
Hours
A
Activities
A
Factors
A
Effects
A
User Variables 67
A
Measurements 476

Tags

Time Spent on Engineering & Technology Activities
Time Spent on Engineering & Technology Activity

Below is the degree of change seen after Time Spent on Engineering & Technology Activities is higher than average.

Below is the change in Time Spent on Engineering & Technology Activities seen after the predictor is higher than average.

Outcomes
of
Below is the change in the listed outcome after is higher than average.
Sort by Effect Size
Sort by Confidence
% Change from Baseline*
*
Change in the listed outcome after is higher than average.
Predictors
of
Below is the change in after the listed predictor is higher than average.
Sort by Effect Size
Sort by Confidence
% Change from Baseline*
*
Change from the average seen after the predictor is higher than average.

Time Spent on Engineering & Technology Activities Info

Property Value
Variable Name Time Spent On Engineering & Technology Activities
Aggregation Method SUM
Analysis Performed At 2021-06-12
Duration of Action 24 hours
Filling Value 0
Kurtosis 45.491222098604
Mean 30 seconds
Median 3 seconds
Minimum Allowed Value 0 microseconds
Number of Aggregate Predictors 8
Number of Aggregate Outcomes 9
Number of Measurements 476
Number of Measurements (including those generated by tagged, joined, or child variables) 476
Public true
Onset Delay 0 seconds
Standard Deviation 0.025082780690878
Unit Hours
User Variables 67
Variable Category Activities
Variable ID 6059894
Variance 0.0020207382368003