Time Spent on Design & Planning Activities Mega Study
Contents
Time Spent on Design & Planning Activities
Time Spent on Design & Planning Activities

Related

A
Hours
A
Activities
A
Factors
A
Outcomes
A
User Variables 56
A
Measurements 321

Tags

Time Spent on Design & Planning Activities
Time Spent on Design & Planning Activity

Below is the change in Time Spent on Design & Planning Activities seen after the predictor is higher than average.

Predictors
of
Below is the change in after the listed predictor is higher than average.
Sort by Effect Size
Sort by Confidence
% Change from Baseline*
*
Change from the average seen after the predictor is higher than average.

Time Spent on Design & Planning Activities Info

Property Value
Variable Name Time Spent On Design & Planning Activities
Aggregation Method SUM
Analysis Performed At 2021-07-04
Duration of Action 24 hours
Filling Value 0
Kurtosis 46.895961337545
Mean 47 seconds
Median 2 seconds
Minimum Allowed Value 0 seconds
Number of Aggregate Predictors 54
Number of Aggregate Outcomes 42
Number of Measurements 321
Number of Measurements (including those generated by tagged, joined, or child variables) 321
Public true
Onset Delay 0 seconds
Standard Deviation 0.047676407851549
Unit Hours
User Variables 56
Variable Category Activities
Variable ID 6059945
Variance 0.0081331293966816